Toilet Partition Installers Near You: Where Our Crews Work

Restroom Stalls and All is a toilet partition installer with its own W2 crews. We install toilet partitions, urinal partitions and restroom accessories in six Southeast states. If you searched for bathroom partition installers near me, enter your project ZIP in the Instant Quote: the installation option turns on where our crews work. Outside that area we ship the partitions with standard hardware and your contractor installs them.

What does bathroom stall installation cost?

Installation typically runs $350 to $500 per stall. Demolition, haul away, travel and after-hours work are listed separately. Material prices by type are in our partition pricing guide.

How long does restroom stall installation take?

A typical restroom with three to five stalls is installed in one day. Larger packages are phased to match the project schedule.

Are your installers employees or subcontractors?

Employees. Our installers are background-checked W2 staff, licensed and insured, with a certificate of insurance on request, certified payroll for prevailing wage jobs and a one-year workmanship warranty. More answers are in the Installation FAQ.

Why Professional Restroom Partition Installation Matters

Commercial restroom installation is more than just setting panels. It requires strict coordination with ADA requirements, building codes, and real-world jobsite conditions. When partitions or accessories are installed incorrectly, the impact can extend far beyond the restroom.

Icon

Failed Inspections And Project Delays

Incorrect clearances, improper mounting, or non-compliant hardware placement can lead to failed inspections, delaying project timelines and creating friction with owners and inspectors.

Icon

Costly Tear-Outs And Rework

Installation mistakes often mean tearing out panels, replacing hardware, and repairing substrates, adding unnecessary costs and pushing schedules off track.

Icon

Fines, Legal Exposure & User Complaints

ADA violations and improper installations can expose owners to legal risk, accessibility complaints, and long-term usability issues in high-traffic facilities.

Risk
Bottom line: who installs your commercial restroom partitions matters as much as what you install.

W2 · LICENSED · INSURED INSTALLERS

Installer

W2 · LICENSED · INSURED INSTALLERS

When you choose RSA, you are not relying on unknown subcontractors. You are working with our own installation crews, who do restroom partitions and Division 10 work every day. Every member of our field team is:

  • Own W2 crews, background checked, not subcontractors
  • Licensed and insured, with a COI on request and certified payroll for prevailing wage jobs
  • Experienced in commercial, institutional, and high-traffic environments, with a one year installation workmanship warranty
Info

Our Georgia-based W2 installers and Southeast service coverage ensure consistent quality, accountability, and communication from start to finish.

CraftsmanshipThat Sets the Standard

We treat every restroom as a long-term asset, not a punch-list item. Our installation team follows strict quality standards to ensure every partition system is built for durability, performance, and a professional finish. The difference shows in the details.

Clean Connections

Clean, finished transitions at every surface. Tight connections at walls, floors, and ceilings, no gaps, no exposed edges, and no shortcuts that compromise the final result.

Consistent, Code-Compliant Privacy Gaps

Uniform gaps that balance privacy and accessibility. Every stall is aligned with consistent spacing that meets ADA requirements while maintaining user privacy.

Precision Measurements

Measured right before installation begins. Every panel, pilaster, and hardware component is verified for exact fit, reducing errors and ensuring a smooth install.

Plumb, Level & Square Alignment

Built to look right and function properly. Panels are plumb, pilasters are level, and doors are square, delivering consistent performance and a clean, professional appearance.

Clean, Controlled Jobsite Execution

Respect for your project from start to finish. We maintain organized, safe job sites throughout installation, minimizing disruption and delivering a clean final turnover. We don’t just install restroom partitions; we build durable, code-compliant systems designed to perform in schools, offices, healthcare facilities, retail environments, and other high-traffic spaces.

OurMulti-Point Quality Assurance Process

Every RSA installation follows a structured, multi-step quality assurance process to ensure accuracy, compliance, and long-term performance, no matter the size or complexity of the project.

Clean, safe job sites from arrival to final sweep

We don’t just install partitions; we build durable restroom systems designed for daily use in schools, offices, retail environments, and more.

Highlight

Our Multi-Point Quality
Assurance Program

To make sure every installation is done right the first time, RSA follows a multi‑step Quality Assurance Program on every project:

01

Pre-Installation Site Review

  • On bid and premium jobs: site survey and field measure before ordering
  • Verify field conditions, substrate, and wall blocking
  • Confirm rough-in locations and coordination with other trades
02

Product & Layout Verification

  • Cross-check drawings, materials, and hardware packages
  • Validate ADA clearances, door swings, and stall layout
03

Hardware & Material Checks

  • Confirm correct material type (HDPE, laminate, phenolic, stainless steel)
  • Inspect hinges, latches, brackets, and anchors prior to install
04

Installation & Fine Adjustment

  • Set, secure, and brace panels and pilasters
  • Adjust doors for smooth operation and proper alignment
05

Final Safety & Alignment Inspection

  • Re-measure clearances and verify grab bar placement
  • Confirm ADA and applicable code compliance
06

Post-Installation Walkthrough

  • Review completed work with your superintendent or facility manager
  • Address punch-list items and provide care and maintenance guidance

Code & ADA Expertise Built In

At Restroom Stalls and All, code compliance isn’t an afterthought. It’s built into every project from the start. Commercial restroom partitions must meet strict ADA and building code requirements, including exact dimensions for stall width, clearances, door swings, and fixture placement. Even small layout or installation mistakes can lead to failed inspections, costly rework, or accessibility issues. Our team stays current with national and state-level codes to ensure every restroom we help design, supply, or install is fully compliant and ready for inspection.

U.S. ACCESS BOARD

2010 ADA Standards

We follow the 2010 ADA Standards for Accessible Design, which define requirements for wheelchair-accessible and ambulatory stalls, including clearances, grab bar placement, door configurations, and turning space.

INTERNATIONAL BUILDING CODE

ICC A117.1

Widely adopted across the Southeast, ICC A117.1 works alongside the International Building Code (IBC) to reinforce accessibility standards and ensure consistency in commercial construction.

STATE OF GEORGIA

Georgia Accessibility Code

For projects in Georgia, we comply with state-specific accessibility requirements adopted in conjunction with the IBC, ensuring local code alignment and smooth inspections.

STATE OF FLORIDA

Florida Building Code

In Florida, we follow the Florida Building Code and accessibility guidelines, which include specific requirements for toilet compartment dimensions, clearances, and fixture placement.

RSA doesn’t just understand these codes. We apply them in real-world conditions. From layout planning to final installation, we help ensure your restrooms are accessible, code-compliant, and built for everyday use. The result is a space that works for everyone and is built to pass inspection.

Icon

RSA’s team understands how these technical details apply in the real world, so you get restrooms that are comfortable for users, accessible for everyone, and ready for inspection.

Restroom Cubicles

Premium Restroom Cubicle Installation Across the Southeast

Restroom Stalls and All specializes in the installation of premium, privacy-focused restroom cubicle systems designed for modern commercial environments where appearance, durability, and user experience matter, not just basic function.

These high-end restroom cubicles deliver a clean, architectural aesthetic with enhanced privacy and superior performance in high-traffic spaces. Proper installation is critical. Our team ensures precise layout coordination, tight panel alignment, smooth door operation, and correctly installed hardware for long-term reliability. RSA is an authorized and certified distributor and installer of Bobrick Privada, Bobrick’s premier high-privacy cubicle system. This certification reflects our expertise in handling advanced partition systems that require a higher level of precision, coordination, and installation knowledge.

We work with leading manufacturers like Bobrick and ASI to deliver premium partition systems that meet both aesthetic goals and code requirements. Whether you're planning new construction or upgrading an existing facility in Georgia or across the Southeast, RSA brings the experience and certification needed to get it done right.

Explore our Premium Restroom Cubicles & Privacy Partitions page to compare top systems, including Privada, and request pricing from our team.

EXPLORE PREMIUM CUBICLES

One Team from Office to Job Site

Successful restroom installations require more than skilled labor. They require clear
communication, proactive coordination, and dependable scheduling. At RSA, our office and field teams work together to deliver a smooth, low-stress installation experience from initial quote through final walkthrough.

Restroom Installation

One call. One team. Total accountability. Your RSA project manager is your single point of contact from quote to closeout, delivering a streamlined process you can rely on.

One Project Manager, Start to Finish

One point of contact from start to finish. Your RSA project manager oversees timelines, material coordination, deliveries, and jobsite access, so you’re not managing multiple vendors or chasing updates.

Pre-Construction Support

Solve problems before they reach the field. We assist with partition layouts, material selection, and hardware coordination early in the process, helping reduce RFIs, avoid conflicts, and keep your project moving forward.

GC, Architect & FM Coordination

Aligned communication across all stakeholders. Our team works directly with general contractors, architects, and facility managers to ensure Division 10 details are coordinated and nothing falls through the cracks between trades.

Phased Turnover Scheduling

Built around real construction timelines. We schedule installations to match project phasing and turnover requirements, helping ensure restroom scopes don’t delay overall project completion.

Installation Services Across the Southeast

As toilet partition installers with our own W2 crews, Restroom Stalls and All delivers professional installation services across the Southeast, backed by project management and proven jobsite performance. Installation isn’t an add-on for us. It’s a core part of what sets RSA apart. Our team specializes in coordinating Division 10 installations in real-world construction environments, ensuring every project is completed safely, efficiently, and to the highest standards of quality and code compliance.

General Contractors & Construction Managers

Built for the demands of active job sites. Our crews work alongside other trades, following site protocols, safety standards, and schedules. We coordinate directly with superintendents to keep your Division 10 scope aligned and moving forward without delays.

School Systems & Universities

Experienced with tight timelines and phased occupancy. We understand the urgency of summer shutdowns, school calendars, and punch-list deadlines. Our team delivers efficient, high-quality installations that are ready for students, staff, and daily use. Many schools choose solid plastic HDPE partitions; see our school and university projects.

Healthcare Facilities & Medical Offices

Precision installation with zero disruption. From ADA-compliant grab bars to cubicle curtain tracks and healthcare-grade partition systems, we install with a focus on cleanliness, compliance, and minimal impact to occupied environments.

Retail Centers & Restaurants

Fast, durable solutions for high-traffic environments. We help keep projects on track with efficient installation timelines and durable restroom accessories and baby changing stations that stand up to constant use, so you’re ready for opening day.

Corporate Offices & Multi-Tenant Buildings

Coordinated installation in occupied spaces. We manage phased deliveries, work around active tenants, and maintain clean job sites to minimize disruption while delivering a polished final result. For a high-end look, see premium restroom cubicles.

Municipal, Religious & Community Facilities

Code-compliant installation for public-facing spaces. RSA supports government buildings, houses of worship, and community facilities with installations that meet strict code requirements, including prevailing wage projects with certified payroll, while maintaining quality and accountability. No matter the project type, RSA brings the same level of craftsmanship, coordination, and accountability, delivering Division 10 installations that are built to perform and ready for inspection.

Division 10 Installation Across the Southeast

RSA delivers professional restroom partition and Division 10 installation services across the Southeast, supporting projects from Georgia to Florida and throughout the surrounding region. With our own W2 installers and project management, we handle everything from single-site renovations to large, multi-location rollouts. Our reach, consistency, and jobsite expertise make us a trusted installation partner for contractors and facility teams throughout the Southeast.

Team

Let’s get your project on schedule.

Request a quote or share your drawings to start coordinating your installation with RSA.